Skip to main content

The resource decision | A question to investigate

Cleaning is a process decision too

The end of a production batch is the start of another resource-intensive sequence. Cleaning can consume materials, utilities and scarce equipment time while protecting the next product. The opportunity is to understand which parts of that sequence are necessary, which are uncertain and what evidence would support a carefully controlled improvement.

Film credits

In the conversation.

NEUVIOR and our founder’s perspectives have appeared across science, business and technology publications.

University of Warwick IATL | AI Ethics NowpharmaphorumTechRadar ProET PharmaFinancial TimesPharmaceutical TechnologyPharmaTimesManufacturing ChemistDigital HealthDaily BusinessTheBusinessDesk.comStartups MagazineInsider MediaYorkshire PostYork PressBusinessCloud

Reporting, commentary, letters and podcast appearances | Read each feature for its format and source.

A problem shared by operations and quality

A site director sees turnaround time and production capacity. A quality lead sees residues, cross-contamination and the reliability of the cleaning procedure. Engineering sees spray coverage, dead legs and inconsistent utility conditions. A proposed NEUVIOR study would examine one equipment train and one defined product changeover. It should help these teams frame the same decision, instead of asking quality to approve a reduction that has already been promised commercially.

Include the whole changeover

Measure pre-rinse, detergent preparation, main wash, final rinse, drying and waiting. Include water grade, solvent use, heating, sampling, rejected cleaning cycles and equipment availability. Keep product-contact and non-product-contact activities distinct. The functional comparison is an equipment train ready for its next authorised use, not merely a shorter wash or fewer litres at one stage. If extra manual inspection or re-cleaning is needed, capture that effort too.

Less is not automatically better

A reduced rinse may lower water demand while increasing the chance of repeating the entire procedure. A hotter wash may improve removal but require more energy or change material compatibility. Longer campaigns can reduce the number of cleanings but alter production flexibility and inventory. These are competing hypotheses for a controlled study, not generic instructions to change a validated process. The existing cleaning acceptance criteria and responsible quality authority remain central.

Resource Economics | See the boundary

Where does the
improvement end?

A material can leave one ledger and enter another. Expand the view to see what a manufacturing decision still needs to account for.

A process and the resource flows around itFresh materials and water enter production. Used material may pass through recovery and return when suitable. Utilities support production and recovery; residues require treatment. Boundary selection changes which activities are included. This is a schematic without measured quantities.Fresh materialsWaterProductionSame product requirementAccepted productThe comparison unitRecoveryTest before reuseSuitable material returnedUsed material collectedUtilitiesHeat, power, coolingTreatmentA real destinationResidues and rejectsWider view: cleaning, shared services and relevant upstream or downstream activity
Schematic | Paths show relationships, not measured mass or energy. Select a boundary above.

What is needed to make the same accepted product?

A smaller input is only the beginning.

Included
Fresh materials, water, the transformation and accepted product output.
Still unresolved
Recovery energy, treatment, cleaning and upstream production are outside this first view.
The decision
Use this view to locate a material-intensive step. It cannot establish a whole-process environmental advantage.
Evidence to bring
Batch-linked charges, accepted output and a consistent product specification.

Boundary context: ACS (2014) and EMA (2026). Study framing is NEUVIOR’s proposed approach.

A first study with useful limits

The proposed work would reconcile equipment logs, cleaning recipes, utility records, swab or rinse results, deviations and changeover timestamps. Compare representative successful cycles before selecting a candidate adjustment. Qualified site specialists would determine whether an experimental cleaning study is justified and how it should be approved. The output would be a demand map, variation analysis and ranked evidence gaps, with an explicit distinction between observation, modelling and any later authorised trial results.

Two kinds of value

Economic indicators might include cleaning consumables, laboratory effort and the value of genuinely usable capacity. Additional production revenue should not be assumed merely because a cycle is shorter. Environmental indicators would include water volume, solvent mass, energy and waste destination per successful changeover. Report the number of failed or repeated cycles separately; a favourable average can hide the operational events that make an option unattractive.

Protect the next batch

Stop if the proposed adjustment cannot demonstrate the required cleaning outcome, weakens traceability or depends on an unrepresentative easy-to-clean product. Where the available records cannot distinguish waiting from active cleaning, resolve measurement first. A bounded paid diagnostic can therefore be worthwhile even without a recipe change: it identifies where time and materials go and what a defensible next experiment would need to establish.

NEUVIOR Data Analysis

A source.
A question.
A clearer decision.

Useful intelligence keeps its evidence attached.

Our public analysis connects a defined question with named sources, reporting periods and methods. Each source below shows the work available today and the access still needed.

Published-data analysis, research hypotheses and evidence studies are distinct kinds of work. Their meaning should remain clear as the programme grows.

Department for Energy Security and Net Zero | Annual, with revision notices

Greenhouse-gas conversion factors 2026

Which dated factor and accounting boundary fit a measured resource activity?

Dataset retrieved

Official source

American Chemical Society | Green Chemistry Institute | Method reference; inspect dated guidance

Process Mass Intensity method

Which material inputs dominate a process, including water?

Method reference

Official source

European Medicines Agency | On guideline revision

Chemistry of active substances guideline

What process, recovered-material and impurity controls belong in a resource proposal?

Document retrieved

Official source

Explore NEUVIOR Data Analysis

The brief for the next investment decision

The decision brief would separate active cleaning, required hold time, laboratory waiting and scheduling delay. That distinction matters because each has a different owner and a different route to improvement. Quality would define the cleaning outcome that must be preserved; operations would identify when released equipment could be used; engineering would assess whether utilities and equipment behave consistently. A candidate change should proceed only with an agreed way to detect failure and return to the authorised procedure. Faster turnaround would be reported as potential capacity until practical use is demonstrated.

Sources and scope

European Commission | Annex 15 Qualification and validation

EMA | Quality of water for pharmaceutical use

ACS | Process Mass Intensity Calculation Tool

These references inform the questions and boundaries. The study design above is a proposed NEUVIOR approach, not a published result or an installed service. Scope, specialist partners, access, responsibilities and fees would be agreed before any commissioned work.

Bring us the decision you need to make

A useful first discussion starts with one process, one accountable owner and the choice that needs evidence. Share the decision deadline, the information already available and what a credible result would allow your team to do next.

Another useful angle.

NEWSPerspectives & features