Skip to main content

Every resource has a role. Every improvement needs a reason.

Medicine depends on more than the molecule. It depends on the energy that holds a process steady, the materials that protect a product, and the decisions that determine what is used again.

We study where better science can make those resources work harder. The aim is practical: help industry identify changes worth developing, investing in and adopting.

In the conversation.

NEUVIOR and our founder’s perspectives have appeared across science, business and technology publications.

AI Ethics Now | University of Warwick IATLPharmaphorumTechRadar ProET PharmaFinancial TimesPharmaceutical TechnologyGeneOnlinePharmaTimesManufacturing ChemistDigital HealthDaily BusinessTheBusinessDesk.comStartups MagazineInsider MediaYorkshire PostYork PressBusinessCloud

Reporting, commentary, letters and podcast appearances | Read each feature for its format and source.

White capsules moving through metal manufacturing machinery
Image credits

The next medicines opportunity is also an industrial one.

A medicines manufacturer has to deliver a dependable product while managing electricity, materials, maintenance and capital. Improving one part of that system can change the demands on another. The interesting opportunity lies in finding improvements that remain useful when those realities are counted together.

Our Resource Economics work connects energy intelligence, materials research and recovery with the business case for change. It asks a more valuable question than whether something looks greener: what does it do, what does it replace, and why would an industrial user choose it?

17% of NHS England’s Carbon Footprint Plus was attributed to medicines and prescribing in its 2024/25 assessment. This category excludes direct emissions from inhalers and anaesthetic gases.

An opened green industrial chiller heat exchanger with internal compartments and connected pipework.

An opened chiller heat exchanger reveals the physical equipment behind a heat-transfer duty.

Rsparks3 · Disassembled chiller heat exchanger.jpgCC0

A steadier process. A smarter energy decision.

Chilling and freezing have a precise job: maintain the conditions the process needs as operating demand changes. PHARMORIS-ECO investigates whether predictive approaches can improve energy performance in fixed pharmaceutical manufacturing equipment.

The useful questions are concrete. When does tomorrow’s workload alter today’s operating decision? How much can ambient conditions explain? Where does a well-tuned existing control already perform strongly? Answering these questions helps identify where a more intelligent approach has a worthwhile industrial role.

A new material needs a useful place in medicine.

Bio-derived materials become commercially interesting when their properties meet a real application. Preparation, thickness, humidity, storage and handling can all change what a film can do. Those details decide whether an attractive laboratory sample can address an industrial problem.

ZYLON’s completed initial feasibility work explored bio-derived materials and selected recovery opportunities, including seaweed-derived candidates. The next development proposition is application-led: identify the function, compare with the incumbent material, and establish which further tests would make a decision clearer.

Industrial decisions

Which improvement survives the complete industrial comparison?

An engineering gain becomes investable when the product, process and business can all carry it. Select a resource route to see what would need to stay equivalent, which extra burdens might appear, and where a focused study could make the next commitment clearer.

Manufacturing, quality and investment teams

Editorial decision model, not measured NEUVIOR results.

The useful gain has to persist through ordinary operation.

An operations team needs to know when the alternative works, what happens during an exception and whether existing controls can deliver much of the same benefit. The next study should distinguish a real operating advantage from a favourable comparison period.

Define the baseline and a credible failure condition.

In focus

Useful process duty

Begin with what the process must actually deliver: a defined material, controlled condition or product function. Comparing unlike outputs can make an apparent improvement disappear when the manufacturer attempts to use it at the required quality.

  • Same useful service
  • Same required function
Evidence to keep in view

Required product specification and operating duty.

A useful next step

Describe one output the comparison must preserve.

A scoped resource study should connect one industrial duty with a defensible adoption decision.

Recovery matters when the next use is real.

A recovered output needs a destination, a specification and a buyer who can use it. Yield alone cannot answer that question. Purity, consistency, additional processing and the resources consumed in recovery all shape whether the loop is useful.

We want resource research to connect the recovered material with its intended function. That means examining what has to be removed, what quality has to be maintained and where the resulting output could enter an appropriate process. It also means recognising where avoiding a waste stream is more useful than recovering it afterwards.

Material journeys · External research · 2016

Recovered.
Ready for what?

Watch a material separate.
Then follow the questions that remain.

Full source frame · silent viewing copy
Selective dissolution of perovskite solar cells. Kim et al. (2016), Supplementary Movie 1. Complete published sequence, 29.10 seconds.

Two solar-cell samples are dipped into a dish in turn. Dark layers visibly dissolve; clearer substrates are returned beside the dish and fragments remain in the liquid. Material identities and chemical measurements come from the paper.

Published · Nature Communications 7, 11735

CC BY 4.0 · Full frame and sequence retained. Original audio removed.

Follow both routes.

The paper describes selective dissolution of the perovskite and hole-transport layers, leaving a gold electrode and a coated conducting-glass substrate. It also examines lead contamination and residual solvent (Kim et al. (2016)).

Starting material in the studyPerovskite
solar cell
Laboratory scale
Next destinationDefine it.Build your own scope

A conceptual reading of the study. Line width, colour and position do not represent mass, hazard, recovery yield or environmental impact.

Recovered material

Separation is visible.
Suitability needs evidence.

Separate analysis in the paper

0.41%

Lead impurities reported in collected gold electrodes, with reference to Supplementary Table 1 (Kim et al. (2016)).

This percentage is reported by the authors. It is not a purity measurement made from the film, a buyer’s acceptance limit or a result for your material.

Take the next question

What composition, condition and acceptance test would the intended user require?

From watching to a useful question

Specify the output.
Expose the gaps.

Describe a recovery question from your organisation. Build a source-linked brief for discussion. Blank fields remain unknown; the published study does not fill them for you.

Local to this page. Nothing is submitted or saved between visits. Include no patient or confidential information.

Your unverified local context

Required to name the question. The solar-cell material is not assumed.

State the property, limit, units and evidence needed. A named condition is not a verified specification.

Optional quantity to scope Your estimate; no calculation

Document references or links, with dates and conditions if known. Entries remain unverified notes.

Start with a material. Everything else can remain an explicit evidence gap.

Read the source, changes and boundaries

The original research

Kim, B. J., Kim, D. H., Kwon, S. L., Park, S. Y., Li, Z., Zhu, K. and Jung, H. S. (2016) ‘Selective dissolution of halide perovskites as a step towards recycling solar cells’, Nature Communications, 7, 11735. Published 23 May 2016. doi:10.1038/ncomms11735.

Original Supplementary Movie 1 · Source record · CC BY 4.0.

© the authors 2016. The article licence includes third-party material unless a credit line states otherwise. Reuse does not imply author, institutional or publisher endorsement.

What this section does

The complete original 29.10-second sequence is retained at 854 × 480 and 29.97 frames/s. The H.264 video is copied without re-encoding into MP4, with all original audio omitted. The poster is a full-frame WebP still at approximately 26.03 seconds. No frames are generated, cropped, rearranged or colour-graded.

All video packet timestamps, durations and decoded frames are unchanged. MP4 stream-duration metadata reports the final sample end, one 1/29970-second tick longer than the original stream-duration metadata (approximately 33.37 microseconds).

Viewing points are approximate recording positions, not measured process milestones. The diagram organises questions; it is not a simulation or mass balance. Form entries are unverified notes.

What needs a separate study

This 2016 solar-cell experiment does not establish another material’s output quality, recipient acceptance, safe disposal, total resource demand, net environmental benefit or commercial return. It is not footage of a NEUVIOR installation or medicines manufacturing.

Reported lead impurities and treatment values are separate paper analyses. The film does not supply a complete treatment chain. Copyright reuse does not establish patent freedom, safety or regulatory suitability. Published context and your local notes remain separate in the exported brief.

Source and film credits

Resource Economics | See the boundary

Where does the
improvement end?

A material can leave one ledger and enter another. Expand the view to see what a manufacturing decision still needs to account for.

A process and the resource flows around itFresh materials and water enter production. Used material may pass through recovery and return when suitable. Utilities support production and recovery; residues require treatment. Boundary selection changes which activities are included. This is a schematic without measured quantities.Fresh materialsWaterProductionSame product requirementAccepted productThe comparison unitRecoveryTest before reuseSuitable material returnedUsed material collectedUtilitiesHeat, power, coolingTreatmentA real destinationResidues and rejectsWider view: cleaning, shared services and relevant upstream or downstream activity
Schematic | Paths show relationships, not measured mass or energy. Select a boundary above.

What is needed to make the same accepted product?

A smaller input is only the beginning.

Included
Fresh materials, water, the transformation and accepted product output.
Still unresolved
Recovery energy, treatment, cleaning and upstream production are outside this first view.
The decision
Use this view to locate a material-intensive step. It cannot establish a whole-process environmental advantage.
Evidence to bring
Batch-linked charges, accepted output and a consistent product specification.

Boundary context: ACS (2014) and EMA (2026). Study framing is NEUVIOR’s proposed approach.

Resource Economics | The factor and its boundary

One factor.
One stated boundary.

A conversion is useful when its activity, unit and scope match the question. Inspect a real reference row, then optionally enter a matching measured quantity.

1.2 | July revised flat file | Three selected rows from the 2026 DESNZ flat file. Changing the activity clears the quantity so a different unit is not reused silently.

DESNZ | 2026 published reference

0.13096kg CO2e per kWh

Electricity generated | Electricity: UK

Source classification: Scope 2
Factors by Category | Workbook row 3066

Generation is one part of the electricity boundary.

This row converts a matching electricity quantity in kWh using the published UK electricity-generated factor.

Separate transmission, distribution and well-to-tank factors are excluded. This is not a full-grid lifecycle result or a complete purchased-electricity footprint.

Optional | A single-activity scenario

Use kWh for the defined electricity activity. A tariff, bill total or power rating in kW is not the same quantity.

Start with the activity record

The quantity is yours to establish.

No quantity entered. Choose a matching activity and unit before calculating.

What should a professional check next?

Confirm the activity period, geography and reporting boundary before selecting any additional factors. Do not describe this single-row estimate as the whole impact of an electrical process.

Keep the measurement period, source record and factor edition together. A change in the selected factor is not evidence of an operational improvement; a reduction claim would need a comparable baseline and the relevant wider boundary.

Inspect the method and source edition

Calculation: entered activity quantity × the selected published factor = kg CO2e for that activity boundary. Factors are preserved as retained in the source rows. Displayed results use up to eight significant digits; that display precision does not establish measurement accuracy.

The input starts blank. Zero is accepted as an explicit quantity; a missing value is not treated as zero. Negative, non-finite, non-numeric and unrepresentable quantities or results are rejected. No scenario input is sent or saved, and the component never adds the electricity and water rows into an organisation total.

Source: Department for Energy Security and Net Zero (2026), greenhouse-gas conversion factors, version 1.2 | July revised flat file. Worksheet: Factors by Category. Selected factor ID: 7_400_4000_5_1. Inspect the retained official workbook.

Contains public sector information licensed under the Open Government Licence v3.0. DESNZ (2026) | Publication and methodology.

Make the commercial case as carefully as the scientific one.

Manufacturing teams need to understand process performance. Quality teams need to understand the change. Finance teams need to understand the cost of adoption. A strong industrial proposition gives all three a reason to take the next step.

Our evaluation approach brings operating resources, implementation effort, maintenance and useful lifetime into the same comparison. A reduction that depends on extra treatment, downtime or replacement equipment needs to be assessed on that basis. The goal is a decision a manufacturer can defend, with the important assumptions visible.

• Manufacturing and engineering | A clearly bounded operating problem and a comparison that accounts for load, stability and equipment requirements.

• Quality and regulatory teams | A proposed change that can be examined through the organisation’s established quality and change-control processes.

• Procurement, finance and investors | An adoption case that explains the intended buyer, the cost drivers and what further evidence would change the investment decision.

Measure what matters to the decision.

We organise resource questions around a functional comparison: the same useful output, the same operating requirement and a clear account of the differences. Energy intensity, material use, process stability and the cost of a change each have a part to play.

This makes the next study more focused. Define the baseline. Identify the conditions the alternative must satisfy. Record the measurements that would support or weaken the case. A result should explain where further development is worthwhile and what an industrial partner would need to establish before adoption.

• Useful output and quality requirement

• Current operating baseline

• Energy and material demand

• Stability and failure conditions

• Implementation and operating costs

• Evidence needed for the next decision

NEUVIOR Data Analysis

A source.
A question.
A clearer decision.

Useful intelligence keeps its evidence attached.

Our public analysis connects a defined question with named sources, reporting periods and methods. Each source below shows the work available today and the access still needed.

Published-data analysis, research hypotheses and evidence studies are distinct kinds of work. Their meaning should remain clear as the programme grows.

Department for Energy Security and Net Zero | Annual, with revision notices

Greenhouse-gas conversion factors 2026

Which dated factor and accounting boundary fit a measured resource activity?

Dataset retrieved

Official source

American Chemical Society | Green Chemistry Institute | Method reference; inspect dated guidance

Process Mass Intensity method

Which material inputs dominate a process, including water?

Method reference

Official source

European Medicines Agency | On guideline revision

Chemistry of active substances guideline

What process, recovered-material and impurity controls belong in a resource proposal?

Document retrieved

Official source

Explore NEUVIOR Data Analysis

Resource Economics | A mass lens

One kilogram of product.
Everything behind it.

A product’s mass is only part of the picture. Explore the materials behind it, and the input that shapes the balance.

Set the boundary. Enter the masses.

One process boundary. Kilograms throughout. Enter zero for an unused input category.

Final dry product, within the same boundary

Excluding water

Include process water

Starting materials and reactants

Reagents, catalysts and other inputs

Your entries

Process mass intensity

—

kg input per kg product

Enter all five masses. Use zero for an unused input category.

Total material inputsAwaiting entries
Isolated product outputAwaiting entries

The strips will reveal the mass proportions when every field is complete.

Solvents

Solvents used within the selected process boundary, with water entered separately.

A material-input view makes the next question clearer. Quality, hazards, energy and life-cycle impacts belong in the wider decision.

How this works and what counts

PMI = Total material input mass ÷ isolated product output mass

Use one consistent process boundary and kilograms throughout. For a pharmaceutical synthesis, the ACS definition covers the route to the final bulk API, including synthesis, isolation and purification materials and water.

  • The calculator sums the four input categories exactly as entered. Use zero for a category with no input and avoid counting the same material in two categories.
  • Product output is the denominator; it is not an additional input. For the ACS pharmaceutical definition, use final bulk API dried to its expected specification.
  • This is a simplified single-boundary arithmetic view. It does not model convergent routes, intermediate transfers, recycle loops or recovery credits.
  • The product strip shows its mass relative to entered inputs. The unfilled remainder is not identified as waste, emissions or a particular recovered stream.
  • PMI describes material use. It does not by itself determine hazards, energy demand, carbon impact, costs or environmental performance.
  • Inputs and calculations stay in this component's browser memory. This component has no upload, storage or external calculation service.

The method follows the ACS GCI Pharmaceutical Roundtable’s published PMI definition. This is NEUVIOR’s simplified educational interface, not an ACS certification or a validated manufacturing assessment.

Sources checked 2026-10-13. Values shown are rounded for reading; calculations use the numbers entered.

Build the company to match the ambition.

NEUVIOR plans to work towards B Corp certification and NHS Evergreen Sustainable Supplier Assessment Level 3. These ambitions connect the way we operate with the expectations of the people and organisations we hope to work with.

The Evergreen Level 3 target directs attention towards validated net-zero targets, emissions reporting and responsible supply-chain practice. The planned B Corp journey brings a wider view of governance, workers, communities and environmental stewardship. We will publish the milestones as the underlying work is completed.

NHS Evergreen Level 3: target | B Corp certification: planned journey

Which resource decision is holding your next improvement back?

Bring the process, the specification and the question. We can discuss whether a focused research proposition could make the next industrial decision clearer.

Questions with a destination

Find the work
that matters to you.

Start with the decision your organisation needs to make. Each reading journey explores the practical problem, the evidence worth examining and a possible focused evaluation.

18 questions to explore

Continue the programme

  • ZYLON

    Explore ZYLON’s completed initial feasibility record and the application-led questions behind bio-derived materials, recovery, characterisation and industrial adoption.

  • PHARMORIS-ECO

    Explore PHARMORIS-ECO’s research into predictive energy optimisation for fixed pharmaceutical chilling and freezing, alongside process stability and industrial adoption.

NEWSPerspectives & features